EPC / O&M Collaboration Partners — Recruiting Businesses to Share in Design, Construction, and Operations

Get a Free Consultation View All Services

REVIX JAPAN is continuously recruiting partner businesses to handle EPC (Engineering, Procurement, and Construction) and O&M (Operations and Maintenance) as we expand the adoption of grid-scale BESS. Please contact us if you are considering entering the BESS business, adding it to your existing operations, or expanding your specialized technical capabilities into new areas.


What REVIX JAPAN Provides

The REVIX JAPAN EPC / O&M Collaboration Partner Program is built on sharing our own products, projects, and expertise with collaboration partners.

Products and projects provided:

Technical knowledge and expertise provided:


Anticipated Collaboration Patterns

Pattern 1: Construction Specialist Model

A model in which REVIX JAPAN handles customer negotiations, design, and grid interconnection procedures, while the EPC collaboration partner manages the actual construction and installation.

Pattern 2: O&M Specialist Model

A model in which the collaboration partner handles routine monitoring, periodic inspections, and incident response after the system becomes operational.

Pattern 3: Full EPC + O&M Package Model

A model in which the partner takes integrated responsibility from design and construction through ongoing operations and maintenance.


Low-Voltage Grid-Scale BESS Construction Overview (Reference)

The typical construction scope for low-voltage grid-scale BESS (49.9 kW / 100 kWh) is as follows (approximate guidelines based on trial-phase results).

Phase Description
Foundation work Securing approx. 6 tsubo (approx. 20 m²) of level ground; pouring concrete foundation
Unit installation Delivery and installation of KHK-certified fire-resistant enclosure
Electrical work Connection to low-voltage distribution panel; EMS and transformer connections
Grid interconnection work Utility connection verification; protective relay setting
Commissioning System operation verification; EMS configuration; remote monitoring activation

Construction period: Approximately 2 to 4 weeks for a standard site (may vary by conditions).


High-Voltage Grid-Scale BESS Construction Overview (Reference)

High-voltage grid-scale BESS (CE007 and others) involves MW-class large-scale projects.

Item Description
System weight CE007: approx. 23 t
Electrical capacity 2,315 kWh
Protection rating IP55 (suitable for outdoor installation)
Required work Foundation, temporary structures, delivery, electrical, grid interconnection, commissioning
Construction period Negotiated individually by project

High-voltage projects adopt systems provided through collaboration with TDS and NEXTES. Detailed specifications will be disclosed individually to collaboration partners (NDA required).


Benefits of Collaboration


Ready to Get Started?

Contact us with any questions or requests.

Inquire About EPC / O&M Collaboration → Apply for Partnership Seminar / Individual Consultation →